celticdragonfly (
celticdragonfly) wrote2006-09-19 09:12 pm
![[personal profile]](https://www.dreamwidth.org/img/silk/identity/user.png)
Entry tags:
Shawl update
I have finished 13 diamonds per quarter. (The first lace pattern goes up to 15 diamonds per section) I just did row 104 (of eventually 184). The rows now have 490 stitches per row (will eventually have 762). So I'm now 36.5% done. Today I have knit 1,944 stitches so far. 29,818 stitches so far in the whole thing. And yes, I love
selenite, my Spreadsheet Master.
I have a long way to go, but I am getting a lot done. This is for the shawl I started on Sept. 1st. I wish I had started it a lot earlier - it'd be nice to have a shawl for FenCon, but not possible. Next time.

I've mostly been working on it, with a side tangent to do the swatching for Sock Wars, which is starting Friday.
![[livejournal.com profile]](https://www.dreamwidth.org/img/external/lj-userinfo.gif)
I have a long way to go, but I am getting a lot done. This is for the shawl I started on Sept. 1st. I wish I had started it a lot earlier - it'd be nice to have a shawl for FenCon, but not possible. Next time.
I've mostly been working on it, with a side tangent to do the swatching for Sock Wars, which is starting Friday.
no subject
no subject